Installing corrugated roofing 1.
Pvc roof panel installation.
1 determine dimensions 2 cut and nail support structures 3 pre drill tuftex panels 4 fasten panels in place 5.
Many pvc roofing membranes that fail prematurely do so because of initial incorrect installation done by an unprofessional roofer rather than inherent flaws of the roof itself.
Pre drill holes on the ridges.
Most panels come up to 32 feet 9 8 m in length.
You can do it in 5 easy steps.
If you ve got a pergola attached to your house then you might want to give yourself some extra shelter and protection from the weather simply by installing.
Installation guide you you can do it in 5 easy steps can do it in 5 easy steps.
Sit back relax and enjoy.
Ideally you should aim to have the fasteners at the high point of every fourth corrugation.
As with any roofing material ensuring that your pvc membrane is properly installed is a key determinant of the longevity and proper service of the roof.
The pre drilled holes should be eight to ten millimeters in diameter and two millimeters wider than the fasteners you are using to allow room for expansion when the roof is exposed to heat.
Allow for a minimum of 18.
Cut the panels to the desired length.
If yours do not then you will need to drill holes.